The upgrading and renovation project of the core belt workshop of Kaifeng Iron Tower Rubber Group has been successfully completed.
2026,01,26
The upgrading and renovation project of the core belt workshop of Kaifeng Iron Tower Rubber Group has been successfully completed
Kaifeng Iron Tower Rubber Group Co., Ltd. focused on improving the production quality and efficiency of the integral core belt products, and successfully completed the upgrading of the integral core belt workshop. This transformation was carried out around three core aspects: production equipment, process flow, and intelligent control. Core production equipment such as traction and plasticizing equipment was updated, the layout of the production line and the interconnection were optimized, and the intelligent control system of the workshop was upgraded to achieve precise control of production parameters and the coordinated operation of all machines in each link. This further standardized the production process. After the transformation, the workshop effectively solved the problems of tension control and specification matching in the original production process. The core performance of the integral core belt products, such as tensile strength, flame retardancy, and anti-static properties, became more stable. The production efficiency and raw material utilization rate were simultaneously improved, and the cost reduction and efficiency enhancement effects were remarkable. In the future, the company will continue to empower production upgrades through technological transformation, and provide high-quality integral core belt products to meet the high standards of material transportation in various industries such as mining and chemical engineering.